Period O/B
|
:
|
1st of
August 2006 – 7th of August 2006.
|
Function O/B
|
:
|
Witness Owners DP
Trial.
|
UDWDV Deepwater Discovery was located offshore Port
Harcourt during the Trial activities.
The
Basic Function of this Vessel : Ultra-Deepwater
Drilling.
Main Area of Operations : Akpo 101 / OML 130,
Offshore Nigeria.
|
General Specifications
Type of Vessel
|
Ultra-Deepwater Drilling
|
|
Nationality (flag)
|
Panama
|
Official Number
|
289997-PEXT-2
|
Port of Registry
|
PANAMA
|
Callsign
|
HO2114
|
IMO Number
|
9203679
|
Classification ABS
|
+A1E, MODU, FSO, +AMS, +ACCU,
+DPS, DLA, OMBO, DP-3
|
Built
|
Samsung Heavy Industries, Geoje
Island, 2000, South Korea, SHI HN1300
|
Gross Registered Tonnage
|
59,632
|
T
|
Net Tonnage
|
17,889
|
T
|
Deadweight
|
98,000
|
T
|
Displacement
|
103,000
|
T
|
Length Overall
|
227.30
|
m
|
Length between Perpendiculars
|
219.40
|
m
|
Moulded Breadth
|
42.00
|
m
|
Moulded Depth
|
19.00
|
m
|
Moulded Operational Draft
|
12.00
|
m
|
Moulded Scantling Draft
|
13.00
|
m
|
Ocean Transit Draft
|
9.00
|
m
|
Maximum Drilling Depth
|
30,000 ft / 9144 m
|
|
Maximum Water Depth
|
10,000 ft / 3048 m
|
Service Speed
|
12.5 kts
|
|
Transit Speed
|
12.0 kts
|
4 x Wärtsilä
Diesel Engine
Type 8L46B
|
4 x 7800 kW / 4 x 10610 hp
|
|
2 x Wärtsilä
Diesel Engine
Type 6L46B
|
2 x 5850 kW / 2 x 7955 hp
|
1 x MAN Emergency
Diesel Engine
Type D2842LF
|
1 x 433 kW @ 1800 rpm / 1 x 536 hp
|
|
1 x Stamford
Emergency Diesel Generator
Type HC-M534-02
|
1 x 500 kVA / 400 kW / 460V / 60
Hz
|
3 x KaMeWa Bow Azimuth Thruster, FPP,
Non-retractable, Type
UUC 7001
|
3 x 5500 kW / 7373 hp each
|
|
3 x KaMeWa Stern Azimuth Thruster, FPP,
Non-retractable, Type
UUC 7001
|
3 x 5500 kW / 7373 hp each
|
Dynamic Positioning
|
Nautronix 5003 Series
|
|
VMS / PMS
|
Nautronix VMS / PMS 5000
|
Acoustics
|
2 x RS925
|
DGPS
|
Trimble / Astech with Fugro /
Racal demod.
|
|