Period O/B
|
:
|
7th of
June 2007 – 25th of June 2007.
|
Function O/B
|
:
|
Setup &
Witness DP FMEA Trial 2007.
|
UDWDV Jack Ryan was located offshore Port Harcourt
during the Trial activities.
The
Basic Function of this Vessel : Ultra-Deepwater
Drilling.
Main Area of Operations : Akpo / OML 130,
Offshore Nigeria.
|
General Specifications
Type of Vessel
|
|
|
Nationality (flag)
|
|
Official Number
|
|
Port of Registry
|
|
Callsign
|
|
IMO Number
|
|
Classification ABS
|
|
Built
|
Harland & Wolff Shipbuilding
& Heavy Industries, Belfast, 2000, Ireland, UK,
|
Gross Registered Tonnage
|
|
|
Net Tonnage
|
|
|
Deadweight
|
|
|
Displacement
|
|
|
Length Overall
|
|
|
Length between Perpendiculars
|
|
|
Moulded Breadth
|
|
|
Moulded Depth (Amidships) to upper deck
|
|
|
Moulded Operational Summer Draft
|
|
|
Draft at assigned load line
|
|
|
Operating Water Depth (as designed)
|
|
|
Operating Water Depth (as outfitted)
|
|
Service Speed
|
|
|
Transit Speed
|
|
8 x MAN B&W
Main Diesel Engine
Type 9L32/40
|
|
|
8 x ABB Main
Generator,
Model HSG-900-P10-1M1101
|
|
1 x Caterpillar
Emergency Diesel Engine
Type 3516
|
|
|
1 x Emergency
Generator, Model SR-4
|
|
6 x KaMeWa Azimuth Thruster, FPP, CSP,
Retractable, Type Aquamaster UUC
7001
|
|
|
Dynamic Positioning
|
|
|
VMS / PMS
|
|
Acoustics
|
|
DGPS
|
|
|