Enclosure Construction

       

Here, I've installed the Timing Base main tuning 10-turn pot and drilled pilot holes for the other pots and the X output of the Timing Base. I also have lines drawn all the way across the front (in pencil) to ensure that the other holes for BNC's are lined up and that it will look right in the end.

You may have noticed that I wrote all over this thing as I constructed it. This was to help minimize the screw ups on my part. The great thing about using PCB material is that it was really easy to clean up with steel wool when I was done.