VK6RTH 1981
The 6" thick re-enforced concrete roof is lifted into position on the brick building that houses the site's repeaters and support equipment. 

This concrete roof was poured on the day of the big pour for the tower foundations, about a kilometre away in the quarry.

It was then transported to the repeater site by the mobile crane, shown on the left of the photo. 

The concrete roof was built with an access through it for all
cabling in and out of the building.
Barry VK6KBZ is in the centre of the photo holding one of the guide ropes. 

Repeaters index   -    VK6RTH 2 Metre