Brian's Kayak Journal- Day 006

First, let me backtrack a bit. On day 4 I joined the keel panels. On day 5 I inspected and sanded the keel panels. I then had a few days where I couldn't work on the kayak (1). On day 6 I prepared the side panels for joining.

Today I joined the side panels together. Went fairly quickly due to the preparations I made yesterday. The side panels are in 3 pieces so I had 4 joints to epoxy vs. only 2 for the keel panels.

I'm going to be gone for the holiday weekend, so don't expect an update until July 8

previous entry index next entry

0.7 hours, 8.4 total.

(1) Preparation for the Houston County Airport (CHU) 35th annual fly-in/drive in breakfast. Was reasonably successful. though we had fewer planes fly in than usual.